From: route@monster.com
Sent: Sunday, May 01, 2016 7:46 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Dispatch Clerk
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
WILMER C. DOTSON 817- 899- 2564 (mobile) 129 HEUSEL DR BASTROP Euless Texas 76039
Objective:
A challenging position utilizing my skills, knowledge and experience in
Telecommunications, Aviation, and computer operations. UT SOUTHWESTERN, Dallas,
TX Field Technician June 2014 – July 13, 2015 Staffing: Apex Systems NETWORK INSTALLER Installation of router
from DSO, upgrading software to DSO. Installation of OC48,
while providing software upgrade and changes. Installation of T1
from panel to panel with termination of RJ45 · Install cat 5,cat
5e,cat6,cat 6a station to station(including WAP) · Install open stage 20,open
stage 35,open stage 40,open stage 55(which include program troubleshoot and
blow)patient room, TDM, STD, ADV · build closet from ground up
including running jumpers, patch cords, etc Documentation of all procedures to connect
test laptops to the different ports of the PRAS/FRAS using CAT5 and USB to
RS232 cables. And the software that would be used when working with the
different ports on the cards
Staffing:
United Commtel, on W2 contract Foreman 03/2013-06/2013 AT&T,
West Virginia UMTS UPGRADE AT&T (LTE 2G-3G
GSM UMTS) ·
Site-walks,trenching,site
inspection,inventory,analise bluebprint ·
Before
pictures tower inspection, deliver material (bomb) ·
Snap
ins rig tower mount Antennas mount RRU,TMA, ·
Decon
exsisting antenna RRU RRH install jumpers ret cable,and fiber ·
Mount
battery cabinet, install Raycap, GPS,and Cat Weld ·
Close-out
picture night cut-over PIM sweep troubleshoot ·
Log-in
and out of site completion of JSA and close-out package Staffing:
Avenger Engineering, on W2 Client:
Sprint Contractor
/ Deployment Field Engineer 01/2013-03/2013 Site
Location – Chicago, IL
·
Site-walks,
reading and interpreting site work according to drawings redline of sites
audits ·
Off-loading
and inventory of materials ·
Remove
existing antennas, transmission line, and various components ·
Installation
of antennas, transmission line including foam or air dielectric coaxial
cable, hybrid cable (fiber/DC) connectors, TMAs, diplexers, and jumpers. ·
Set
all antenna azimuths/down tilts per specifications and Rets, RFDS. ·
Assist
in the installation of all aspects of site build to include: trenching,
electric/data conduits, grounding, and power/ radio cabinets. ·
Sweep
testing and recording including fibers on the homerun cable from/to COVPs. ·
Transport
and dispose of removed equipment and waste Staffing:
Avenger Engineering, on W2 Client:
Sprint 10/2012-12/2012 Site
Location – Las Vegas, NV Network
Engineer ·
Metro
PCS, Support Samsung Engineering in the LRU upgrade process … Retrofits
(Field/WH Installation of Modules/Reloading) ·
1X,
EVDO, CMDA, LTE ·
Install
new UAMA, CIMA, CICA cards and upgraded LRU’s ·
Install
new GPS cable from CIMA to GPS combiner ·
Install
new Ethernet Backhaul cable between CIMA and CSR ·
Installation
of DAS (Distributed Antenna System) sites for in-building/area
coverage Commissioning ·
MMBS
configuration and verification and updates to ENV files ·
Confirm connection to BSM/LSM servers with LSM Manager ·
Provide Site Reports (as specified) ·
Completion
of Commissioning and RF Test checklist ·
I&C Closeout and Handoff ·
Retrofits completed in 2 half months with 400 site team visits, 100%
of all task completed. ·
Cutover of all contracted sites completed before K-date. ·
Left in Market for additional RF coverage area adds. Site,
installs/commissioning/cutovers/trouble-shoot. ·
Performed system performance and
optimization of VZW, multi-carrier handoffs. ·
LTE and EVDO systems. Using XCAL, TEMS,
DataPro. ·
Drive tests the 1x network performing site/sector performance. ·
Optimize handoff point triggers, drive tested sites until
required hand-off between networks were correct. 07/2011 –
09/2012 Staffing: WorldLink on W2 Contractor
/ Deployment Field Engineer Site
Locations - Richardson, TX Clients:
Samsung/Verizon/Dragon Wave, low spot coverage project ·
Setup
temp COW/ roof top microwave shots for the new mobile COLTs (mobile BTS
microwave shots) ·
Power
and Build new LTE (4G) sites (Switch and BTS side) (Hardware and Software) ·
Installed
DC Pony power for all sites, RRH power and MW power. Setup routers to work
with LTE eNB. ·
Tested
all MWs head to head and all distance ends after completing site
survey. (RF/MW teams). ·
(Setup
and programs used during this project were/or still company personal info, no
other information given.) 01/2011 –
6/2011 Telecom Specialists, Inc., on W2 Contractor
/ Deployment Field Engineer Site
Locations – Richardson,TX; Coppell,TX; Huntsville, AL; Blountsville, AL;
Birmingham, AL Clients: Samsung/Cell South LTE
Interference Mitigation project ·
Trained
at Samsung Test Lab on all equipment that would be used during the Mitigation
trial, ePC installs, eNB installs / commissioning, firmware updates, RF
testing. ·
Completed
LSM Main Frame Wiring for future commercial LSM/FTP equipment. ·
Installed
ePC, Telco rack to support LTE ·
Installed
Rectifiers and power cabling for test bays. ·
Responsible
for documentation of procedures to include, software/hardware/site installation,
hardware commissioning, firmware upgrades, and RF drive testing. ·
Used
XCAL-LTE program to complete drive testing, eNB coverage and hard over,
intra-site handoff test. Peak download and upload throughput test in
different RF conditions. Radio latency, idle to active latency, call
setup coverage, to name a few. ·
Train
and Support, tower/installation/drive test crews that will be in market for
the Cell South LTE commercial deployment Samsung/Clearwire WIMAX RMA
Troubleshooting project ·
Help
setup test lab and work areas that would be used for troubleshooting and/or
repairs. ·
Documentation
of all procedures to connect test laptops to the different ports of the
PRAS/FRAS using CAT5 and USB to RS232 cables. And the software that
would be used when working with the different ports on the cards or RRH. ·
Received
all hardware returned from the field that was marked as bad or DOA. A
complete inventory and inspection was preformed to insure accountability of
all customer equipment. ·
Worked
with Samsung software/hardware teams to finalize test setup and procedures
that would be used for all future PRAS/FRAS RMAs. ·
Documentation
of all procedures on how to interconnect test bays to run off of AC power
with rectifiers. Installation of GPS, inter bay cables, ground and
power cables. ·
Checked
all micro solder connections/repairs to ensure each were completed correctly
before power up test/check was performed. ·
Logged
all test readings from boards and RRH that were repaired or upgraded ·
Loaded
firmware upgrade software on repaired/NTF boards, ran a base line connection
check to ensure the boards and other equipment passed all test procedures. 06/2010 –
01/2011 Staffing: Apex Discount Computers on W2
Contract
Garland,
TX Computer
Repair Clients:
AT&T and Verizon ·
Laptop
screen replacement ·
Replace
/ Repair laptop DC jack ·
Install
all programs, backup, migrate and import data to new system/computer ·
Hard
Drive data recovery ·
Repair
or replace any bad parts ·
Install
software and updates ·
Clean
dust desktops and laptops ·
Upgrade
Hardware (Ram, Hard Drives, Video card, Mother board, Wireless) ·
Hardware
and Software classes 03/2010–
06/2010
Staffing:
Pocket Wireless on W2 Contract Client:
Samsung Wireless
Technician II / Telecom Engineer Site
Location – Corpus Christi TX ·
Used
electronic test equipment (Anritsu Site Master), measuring devices, meters
and hand tools in analyzing, adjusting, installing, wiring, repairing,
maintaining and testing BTS, microwaves, (Switch) Digital Cross Connects with
field T1/NIU (Network Interface Unit) testing. ·
Performed
required incidental and preventative maintenance on cell sites, power
equipment, RF cables, and associated equipment, and completed necessary logs,
reports and postings. ·
Used
Software (Vortex/Hyper terminal/GUI/GPSTM commander), to access systems and
equipment, BTS alarms and stats. ·
Coordinated
clearing of trouble tickets with other groups and organizations
(Switch/NOC/GTAC/RF Engineering), and worked with other employees and / or
customers in the maintenance and installation of wireless service. ·
Worked
independently, with minimal guidance or assistance. Was On-call tech
24/7 two weeks each month. ·
Provided
instructions, assistance, and guidance to other technicians as required. ·
Conducted
collection of field data (Duplexer/MCPA power readings / Antenna RF cable
sweeps) of wireless market as required. ·
Performed
translations, use computer reading to create, modify, and/or correct database
contents. Created MOPs and preformed all work to make needed
corrections. ·
Deployed
generator backups to sites when AC power was off-line. ·
SWITCH
: ·
Bay/rack
installs, ladder racks, power cables, data cables, fiber runs, T1, DSX, Cisco
routers, 66 and 110 block connections, grounding. 03/2009 –
02/2010 Staffing:
Avenger Engineering on
W2 Client:
Nortel, AT&T
Richardson,
TX Contractor
/ Telecom Engineer Site
Locations – TX, NC, TN, KY, MN, MISS, LA, WI, IL, MO ·
Attended
and graduated Nortel Hardware Specialist Level II Course ·
Nortel
MFRM3 ·
DCG
to EDCG upgrades ·
Rectifier
shelf replacement and extension ·
BTS
(commissioning/testing) ATP testing ·
DOM
script loading and integration/DOM A VPD Retrofits (EVDO) ·
Installed
Nortel WiMAX 16e Indoor BTS 5020/5120 ·
Conducted
Site Audits for all equipment installed in market ·
STL
– coordinating techs with customer, reports, updates on progress, addressing
issues 07/2008 –
01/2009 Client:
Butler Telecom, Inc., Irving, TX Staffing:
Aperion Information Technologies, Inc., on W2 Contractor
/ Telecom Engineer Site Locations - Kenner, LA,
Tampa, FL, Jacksonville, FL and Tallahassee, FL ·
Attended
and graduated Nortel Cell Site Installation Course ·
Nortel
SFRM upgrades ·
Nortel
MFRM2 upgrades ·
Installation
of B-Kit w/battery strings MBIM ·
Installation
of C-Kit radios ·
Installation
of D-Kit EVDO w/DOM card – IMF ·
Wire
wrapping, cabling, splicing, lacing, tie-wraps, wire color coding, new
installations 01/2007 –
06/2007 Staffing:
Apex Systems on W2 Apex
Discount Computers, Balch Springs, TX Computer
Repair
·
Troubleshoot
and fix software and hardware problems Automatic Message Switching
Center ·
Assigned
to position after graduating top of my class in the Automatic Message
Switching Center Operations Course. ·
Responsible
for system operations, requisition of equipment, and maintenance parts. ·
Shipping
and receiving of equipment and parts. ·
Supervised
3 professional switch operators and 3 technical support team members. ·
Accountable
for systems and maintenance resources valued in excess of $3,000,000. ·
Installation,
troubleshooting, and maintenance of low frequency radio Education: 09/2006
Delta High School, Louisiana High
School Diploma
07/2007
Butler Telecom,
Inc.,
Irving, TX Nortel
Cell Site Installation Course Graduated
– received Certificate of Completion Skills: communication
Applicant Database Operations Typing skills 55-65
WPM
Supply Inventory Installation of low frequency
radios
Installation of power generator backups Maintenance of low frequency
radios
Maintenance of power generator backups Office Equipment
Functions
POWER UP SQUID Non-destructive
Inspections
Magnetic Particle/Liquid Penetrant Mount
RRH&RRU
MFRM2/MFRM3 Upgrades from SFRM/MFRM Mount
antenna
Power up Raycap (Basic, Pascal,
RPG)
RF XCAL-LTE; TEMS; DatePro Network
installation
Central Office equipment/bay/DC power installation LTE Installation
Retrofits
Flexi BTS Licensed: NSN (WCDMA GSM/MR LEVEL 2/2G-3G and LTE) both C&I
courses. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|